Blasting Information

Blasting Notices - Updated 06/01/23

HERITAGE HILLS  PHASE 5  BLASTING  COMPLETE
Thursday, June 1, 2023 


The blasting for  Heritage Hills Phase 5, at the corner of North Division Street and STH 19/113, has ended. There may be future minor clean up work. Please check back for more information as it becomes available.

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Thursday, June 1, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Thursday, June 1st, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Wednesday, May 31, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Wednesday, May 31st, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Tuesday, May 30, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Tuesday, May 30th, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Friday, May 26, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Friday, May 26, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Thursday, May 25, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Thursday, May 25, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Wednesday, May 24, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Wednesday, May 24, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Tuesday, May 23, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Tuesday, May 23, 2023. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Monday, May 22, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Monday May 22nd. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Friday, May 19, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Friday, May 19th. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Thursday, May 18, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Thursday, May 18th. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Wednesday, May 17th, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Wednesday, May 17th. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Tuesday, May 16th, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Tuesday, May 16th. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



ATTENTION
HERITAGE HILLS BLASTING PHASE 5
Friday, May 12, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Friday, May 12th. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com




HERITAGE HILLS BLASTING PHASE 5
Thursday, May 11, 2023  


The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-2 times between the hours of 10 a.m.-12 p.m. and 1:00-3:30 p.m. on, Thursday, May 11th. Weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com



HERITAGE HILLS BLASTING PHASE 4 COMPLETE
Thursday, October 6, 2022 
 

The blasting for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, has ended. There may be future minor clean up work. Please check back for more information as it becomes available.

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com


ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Wednesday, October 5, 2022 
  

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Wednesday, October 5, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Tuesday, October 4, 2022 
 

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Tuesday, October 4, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com


ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Monday, October 3, 2022 

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Monday, October 3, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Friday, September 30, 2022 

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 1-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Friday, September 30, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Thursday, September 29, 2022 

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Thursday, September 29, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Wednesday, September 28, 2022 

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Wednesday, September 28, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Tuesday, September 27, 2022 

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Tuesday, September 27, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Monday, September 26, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Monday, September 26, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Friday, September 23, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Friday, September 23, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Thursday, September 22, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Thursday, September 22, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Wednesday September 21, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Wednesday, September 21, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Monday, September 19, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Monday, September 19th, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Friday, September 16, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Friday, September 16th, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Thursday, September 15, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Thursday, September 15th, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Tuesday, September 13, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Tuesday, September 13th, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Thursday, September 8, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Thursday, September 8, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Wednesday, September 7, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Wednesday, September 7, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Tuesday, September 6, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Tuesday, September 6, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Friday, September 2, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Friday, September 2, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION

HERITAGE HILLS BLASTING 
PHASE 4

Thursday, September 1, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on, Thursday, September 1, 2022 weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION

HERITAGE HILLS BLASTING PHASE 4

Wednesday, August 31, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on , Tuesday, August 31, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com

ATTENTION

HERITAGE HILLS BLASTING PHASE 4

Tuesday, August 30, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on , Tuesday, August 30, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com 


ATTENTION
HERITAGE HILLS BLASTING PHASE 4
Monday, August 29, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on , Monday, August 29, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma
SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com 


ATTENTION

HERITAGE HILLS BLASTING PHASE 4
Friday, August 26, 2022

The contractor for the Heritage Hills subdivision, at the corner of North Division Street and STH 19/113, will be blasting 2-3 times between the hours of 9-11 a.m. and 1-3 p.m. on , Friday, August 26, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Brandon Rolsma

SX Blasting
N59 W14601 Bobolink Ave
Menomonee Falls, WI  53051
(414)235-0902
brandon@sxblasting.com 

ATTENTION
QUINCY RIDGE BLASTING
TOWN OF WESTPORT
Friday, December 9, 2022

The contractor for the Quincey Ridge Quarry Project, at 6355 Schumacher Road, will be blasting between the hours of 10 a.m. - 1 p.m. on Friday, December 9, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee/Town of Westport regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Tom Burke 
Account Manager/Blaster
Quick Supply Co.
334 Industrial Drive
Coloma, WI 54930
(608) 778-0385
tburke@quicksupplyco.com 



ATTENTION
QUINCY RIDGE BLASTING
TOWN OF WESTPORT
Wednesday, December 7, 2022

The contractor for the Quincey Ridge Quarry Project, at 6355 Schumacher Road, will be blasting between the hours of 10 a.m. - 1 p.m. on Wednesday, December 7, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee/Town of Westport regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Tom Burke 
Account Manager/Blaster
Quick Supply Co.
334 Industrial Drive
Coloma, WI 54930
(608) 778-0385
tburke@quicksupplyco.com 


ATTENTION
QUINCY RIDGE BLASTING
TOWN OF WESTPORT
Friday, December 2, 2022

The contractor for the Quincey Ridge Quarry Project, at 6355 Schumacher Road, will be blasting between the hours of 10 a.m. - 1 p.m. on Friday, December 2, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee/Town of Westport regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Tom Burke 
Account Manager/Blaster
Quick Supply Co.
334 Industrial Drive
Coloma, WI 54930
(608) 778-0385
tburke@quicksupplyco.com 


ATTENTION
QUINCY RIDGE BLASTING
TOWN OF WESTPORT
Friday, September 2, 2022

The contractor for the Quincey Ridge Quarry Project, at 6355 Schumacher Road, will be blasting 2-3 times between the hours of 10 a.m. - 1 p.m. on Friday, September 2, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee/Town of Westport regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Tom Burke 
Account Manager/Blaster
Quick Supply Co.
334 Industrial Drive
Coloma, WI 54930
(608) 778-0385
tburke@quicksupplyco.com 

ATTENTION

QUINCY RIDGE BLASTING
TOWN OF WESTPORT

Wednesday, August 31, 2022

The contractor for the Quincey Ridge Quarry Project, at 6355 Schumacher Road, will be blasting 2-3 times between the hours of 9 a.m. -12 p.m. on Wednesday, August 31, 2022, weather permitting.

There will be three air horn signals sounded one minute prior to each blast followed by one prolonged air horn signal after each blast is deemed all clear.  On average each blast duration is 500 milliseconds, equivalent to half of a second.

Ground vibration and air blast will be measured with seismographs located on the West and North side of the subdivision property.  All drilling and blasting operations will be conducted in accordance with:

  • The Village of Waunakee/Town of Westport regulations and permit requirements
  • Bureau of Alcohol, Tobacco and Firearms – 27 CFR 181
  • MSHA 30 CFR Part 56 Safety and Health Standards 
  • MSHA 30 – Subchapter H – Education and Training
  • Wisconsin Department of Safety and Professional Services SPS 307.43 

Questions or concerns regarding the drilling and blasting process should be directed to:

Tom Burke 
Account Manager/Blaster
Quick Supply Co.
334 Industrial Drive
Coloma, WI 54930
(608) 778-0385
tburke@quicksupplyco.com